Work from a known first mark to find the two slopes, the flat top and the total shrink.

Choose the rise and flat width

A four-point saddle pairs an upward offset with a downward one. Measure the rise needed for clearance and the width that must stay elevated. The first mark is a separate input measured from a chosen conduit end. The worksheet assumes ideal bends with no radius.

Mark 10, 22, 34 and 46 inches

With a 6-inch rise and 30° bends, each sloped section is 6 ÷ sin(30°) = 12 inches along the tube. For a 12-inch flat top starting after the first slope, measure each mark from the same end. The first slope spans marks 10 to 22, the flat spans 22 to 34, and the return spans 34 to 46.

Allow for both offsets

Each offset shortens the horizontal reach by 6 × tan(15°), about 1.608 inches. Together they use about 3.215 inches, displayed as 3 3/16 inches. Check the finished flat and both clearances on the actual bend because the curved portions occupy part of the layout.